PROJECTS (extract)

STOP MANAGER DORDRECHT

After 1 year of operation the 5th line WtE in Dordrecht was put in maintenance in September 2011. An external team was set up on short notice to prepare, coordinate and control the works. Mr. Buchhorn became the Stop Manager being in charge of the team, planning, costs and quality.  …

DORDRECHT WtE 5th LINE

Dordrecht breit 768


HVC Alkmaar bought the former „Gevudo" plant and decided to extend its capacity and to modernize the plant by building a 5th line having a capacity of 30 t waste per hour. The key challenges in this project were the small area and very tight emission limits.

ENERGY STUDIES

Buchhorn-Projects provides Energy studies to optimise plant operation and to decide on the best parameters for plant design. Aiming for the most economical operation is of special interest if not only electricity but also steam and heat supply is under discussion.  …

DeNOx, INSTRUCTOR / TRAINER 

Mr. Buchhorn learned his lessons about DeNOx, SCR and SNCR from 1984 to 1989 at L.& C. Steinmüller as Project Engineer in the DeNOx Projects & Sales department.

Alkmaar SCR, Febr. & March 2011
Investigation on possibilities to optimise the SCR plants of HVC Alkmaar, WtE lines 1-3.


BEC TWENCE

BEC breit 768


From November 2005 to August 2008, Mr. Buchhorn followed the BEC Project (Biomassa Elektriciteits Centrale) located close to Hengelo, Netherlands. He was contracted by the Dutch Engineering company Tebodin and worked as Project Manager Process in the project team of the final client Twence. …

CHINA

Nangong/ Beijing

On 1 February 2005 Mr. Buchhorn started his own business and Nangong became his first contract.

From February to June 2005 he was involved in the Waste-to-Energy project Nangong. The plant will have two incineration lines and a total capacity of 1000 ton per day of municipal solid waste. …

ALKMAAR, WtE 4th LINE

Alkmaar 1024


In October 2002 Mr. Buchhorn started working for Electrowatt Ekono and became Project Manager Process for the HVC Alkmaar 4th line municipal waste incinerator in North Holland, Netherlands.

The plant, having a throughput of 27 t/h of waste and 75 MW thermal incineration capacity was build next to line 3 during uninterrupted operation.

NAPLES & CAMPANIA, ITALY

Acerra breit 768

Acerra, picture by friendly permission of Steinmüller Babcock Environment GmbH

From 1999 to 2002 Mr. Buchhorn was Head of Technology Project Development (BOOT) with BBP Environment Group, part of Deutsche Babcock. His position can be described as „Owner´s Engineer" with the following responsibilities: